YOUR POSITION:HOME > Blog >

Installation engineering management of sanitary napkin packing machine

Author:Haina Machinery Factory FROM:Diaper Machinery Manufacturer TIME:2023-03-30

According to the technical arrangement of the equipment and the relevant installation technical requirements, the outsourced equipment or the overhauled, transformed or self-made equipment that has undergone out-of-box inspection shall be installed according to the specified foundation, smooth and stable, and meet the construction requirements. Installation specifications, and through debugging, operation, and acceptance, make it meet the production process requirements, called sanitary napkin packing machine installation.

 sanitary napkin packing machine

sanitary napkin packing machine Installation Management Scope


1) In the equipment plan, experience the purchased equipment in the warehouse.

2) Self-made equipment and equipment that has been overhauled or technically transformed according to regulations and passed the acceptance inspection.

3) Equipment transfer according to factory plan, including process layout adjustment.

4) Handling of equipment problems caused by disasters, changes in production objects, etc.

  napkin packing machine

sanitary napkin packing machine Planning and Implementation


1.sanitary napkin machine Basis for compiling installation plan

1) Plant equipment planning.

2) Number of installers, technical level and actual level.

3) Consumption, quota, reserve and ordering of installation materials.

4) Installation cost standard and fixed installation time.

 

2. sanitary napkin packing machine preparation and installation procedures and installation cost budget

1) Prepare the equipment installation plan according to the equipment planning of the factory, the delivery date of the purchased equipment, and the planned progress of the self-made, modified and overhauled equipment.

2) According to the planner's demand for the loading capacity, formulate a cost budget.

3) According to the installation plan, coordinate the project progress with the user department and related departments.

4) According to the installation plan, propose outsourcing projects, technical requirements and cost estimates.

Then according to the equipment inventory and actual arrival situation, etc., the installation project progress, personnel, equipment, material and cost budget, construction drawings and technical requirements are prepared quarterly and monthly, and issued to the construction and use department before the expected start date. Ready for construction.

 sanitary napkin machine

The installation project management of sanitary napkin packing machine is a very strict management system, which needs to be strictly implemented in each station, and attention can be achieved from top to bottom in order to achieve the best results.

Start Customizing Your Machines Now!
Contact US
Manufacturer Address:Wuli Industrial Zone, Jinjiang City,Fujian Province,China
Sale Tel: +86-13599937366
MP/Whatapp: +86-13599937366
Email: inquiry@fjhaina.com

NEW KEYWORD

About Us

Products

Information